6 o’clock in the morning - the metro starts working on all days of the week except Friday 6-8 minutes - the interval of trains of the green metro line is 10-15 meters - the height of most of the route of both metro lines of 14 trains serves the green line during peak hours, off-peak time - 10 trains 18 - total number of green metro line stations 20 seconds - waiting period for trains at red metro line stations 29 - total number of red metro line stations 47 - total number of pedestrian crossings on red and green "metro lines 50 - the total number of trains moving on both lines in h si peak, 28 - at off-peak times, 52.9 km - the length of the red metro line takes 60-63 minutes between the two terminal stations of the red metro line 110 km / h - the average speed of the metro trains without taking into account the time for stops 500 meters - the maximum distance between the metro station and the bus serving it 660 police officers of various ranks ensure the safety of the metro passengers 3,000 surveillance cameras installed at the stations, in the passages and tunnels of the metro 2,000,000 - the average monthly number of passengers served etropolitenom 7.8 billion US dollars - the cost of subway construction Read More
Copyright © 2024
https://dubaiuae.net ug.dubaiuae.net © Tours 2024